Conditioning The Rigging
We undertook the project of completely reconditioning the rigging while we were sitting in Georgetown. This was a huge job and everyone contributed to it's success! All the shrouds needed to be treated with a pine tar solution 3 times. Drake is on "drip patrol" in the above picture... This was actually an important job, as there were tons of them and they would leave a sticky black goo everywhere.
Here is Paul, just hanging out with a pail of Pine Tar, Linseed Oil and Japan Dryer. I think that this job needs to be highlighted on Dirty Jobs! Wow, that all even sounds Greek to me and I can make it :-)
0 Comments:
Post a Comment
<< Home